Commercial Projects
(Please Click on the "Before" Photo to See Stages of Construction)
 

London 2012

3,270m2 of liner was welded on site into a water cleansing catchment pit

 

Before

After
       

Greenford Park Cemetery
This feature was cleaned out and external walls repaired, we also installed a diamond safety grid to prevent pumps and plants’ being stolen as this was becoming a persistent problem

 

Before

After

Church Langley Primary School

The school commissioned this pond build for it's students to use as an educational dipping pond


After

Before
Next
 
   
Main Menu

Back to Top

Contact
   
 



Aquamaintenance

0845 056 8717 / 07771 776311

Free quotations up to 25 miles
Over 25 miles email photos & details for free online estimate

www.aquamaintenance.co.uk

Pond Design, Construction & Maintenance